FABRICATION WORK CARRIED OUT AT UMBRAHAT FOR 42” SBHT PIPELINE PROJECT
	
| PROJECT NAME : | 
FABRICATION WORK CARRIED OUT AT UMBRAHAT FOR 42″ SBHT PIPELINE PROJECT | 
| YEAR : | 
2016 | 
| LOCATION : | 
NAVSARI, GUJRAT INDIA | 
| OPERATOR : | 
M/S. ONGC LTD. | 
| CLIENT : | 
M/S. LARSEN & TOUBRO LTD. | 
| VALUE (M. INR) : | 
 23.6 | 
| PROJECT STATUS : | 
 COMPLETED | 
| DESCRIPTION : | 
FABRICATION OF STRUCTURAL MEMBERS, HANDRAILS, GRATING, WORKING PLATFORMS, SADDLE SUPPORTS ETC | 
 
 
 
 
	MHNRD-III HOOK-UP & MODIFICATION WORKS UNDER MHNRD-III – 5 WELL PLATFORM PROJECT
	
| PROJECT NAME : | 
MHNRD-III HOOK-UP & MODIFICATION WORKS UNDER MHNRD-III – 5 WELL PLATFORM PROJECT | 
| YEAR : | 
2015 | 
| LOCATION : | 
MUMBAI HIGH NORTH FIELD , INDIA | 
| OPERATOR : | 
M/S. ONGC LTD. | 
| CLIENT : | 
M/S. LARSEN & TOUBRO LTD. | 
| VALUE (M. INR) : | 
69.5 | 
| PROJECT STATUS : | 
 COMPLETED | 
| DESCRIPTION : | 
HOOK-UP AND PRECOMMISSIONING WORKS ON WELL PLATFORMS N-19, N-21, N-22 & N-24 AND MODIFICATION ON MNW PROCESS( DO TOWER) AND N-11 WELL PLATFORM( CLAMPON RELATED MODIFICATION) | 
 
 
 
 
	FABRICATION OF N-19 DECK INCLUDING E&I, PIPING & ARCHITECTURAL WORKS FOR MHNRD-III WELL HEAD PROJECT
	
| PROJECT NAME : | 
FABRICATION OF N-19 DECK INCLUDING E&I, PIPING & ARCHITECTURAL WORKS FOR MHNRD-III WELL HEAD PROJECT | 
| YEAR : | 
2015 | 
| LOCATION : | 
 HAZIRA, GUJRAT. INDIA | 
| OPERATOR : | 
M/S. ONGC LTD. | 
| CLIENT : | 
M/S. LARSEN & TOUBRO LTD. | 
| VALUE (M. INR) : | 
83 | 
| PROJECT STATUS : | 
 COMPLETED | 
| DESCRIPTION : | 
FABRICATION OF N-19 WELL PLATFORM DECK STRUCTURE INCLUDING PIPING, E&I AND ARCHITECTURAL AT LTHE HAZIRA YARD. | 
 
 
 
 
	CLEARANCE OF ICPR PUNCH POINTS
	
| PROJECT NAME : | 
CLEARANCE OF ICPR PUNCH POINTS | 
| YEAR : | 
2015 | 
| LOCATION : | 
MUMBAI HIGH SOUTH FIELD, INDIA | 
| OPERATOR : | 
M/S. ONGC LTD. | 
| CLIENT : | 
M/S. AFCONS – GUNANUSA JOINT VENTURE | 
| VALUE (M. INR) : | 
22.5 | 
| PROJECT STATUS : | 
 COMPLETED | 
| DESCRIPTION : | 
PUNCH POINT RELATED WORKS FOR EQUIPMENT, E&I, PIPING ETC PERTAINING TO ICPR PROCESS PLATFORM. | 
 
 
 
 
	UPGRADATION OF SILOS & ALLIED EQUIPMENTS OF BULK HANDLING PLANT (BHP), NHAVA
	
| PROJECT NAME : | 
UPGRADATION OF SILOS & ALLIED EQUIPMENTS OF BULK HANDLING PLANT (BHP), NHAVA | 
| YEAR : | 
2015 | 
| LOCATION : | 
 NHAVA ONGC, MAHARASHTRA | 
| OPERATOR : | 
M/S. ONGC LTD. | 
| CLIENT : | 
M/S. ONGC LTD. | 
| VALUE (M. INR) : | 
 92.58 | 
| PROJECT STATUS : | 
 COMPLETED | 
| DESCRIPTION : | 
DESIGN, ENGINEERING, PROCUREMENT, INSTALLATION OF 8 NOS SILOS AND ALLIED EQUIPMENTS OF BULK HANDLING UNIT AT ONGC NHAVA. | 
 
 
 
 
	E&I WORK FOR VSEB & VSEC OF ADVEP PROJECT
	
| PROJECT NAME : | 
E&I WORK FOR VSEB & VSEC OF ADVEP PROJECT | 
| YEAR : | 
2015 | 
| LOCATION : | 
HAZIRA, GUJRAT. INDIA | 
| OPERATOR : | 
M/S. ONGC LTD. | 
| CLIENT : | 
M/S. LARSEN & TOUBRO LTD. | 
| VALUE (M. INR) : | 
11.2 | 
| PROJECT STATUS : | 
 COMPLETED | 
| DESCRIPTION : | 
ELECTRICAL & INSTRUMENTATION WORK SUCH AS INSTALLATION OF CABLE TRAY, CABLE, INSTRUMENTS, INSTRUMENT TUBING, SHUTDOWN PANEL, CALIBRATION AND TESTING OF INSTRUMENTS ETC. | 
 
 
 
 
	ADVEP PROJECT - ADDITIONAL DEVELOPMENT OF VASAI EAST PROJECT
	
| PROJECT NAME : | 
 ADVEP PROJECT – ADDITIONAL DEVELOPMENT OF VASAI EAST PROJECT | 
| YEAR : | 
2015 | 
| LOCATION : | 
MUMBAI HIGH, BASSEIN FIELD, INDIA | 
| OPERATOR : | 
M/S. ONGC LTD. | 
| CLIENT : | 
M/S. LARSEN & TOUBRO LTD. | 
| VALUE (M. INR) : | 
 69.5 | 
| PROJECT STATUS : | 
 COMPLETED | 
| DESCRIPTION : | 
HOOK UP & COMMISSINING WORK OF NEW WELL PLATFORMS VSEB & VSEC AND RELATED MODIFICATION OF EXISTING BPA PROCESS COMPLEX WHICH INCLUDES INSTALLATION OF 3 PHASE HP SEPARATOR, MOL PUMP, STP, NEW GAS RECIVER, PIPING (APPROX 6400 INCH DIA), STRUCTURAL ( 200 MT) AND E&I WORKS. | 
 
 
 
 
	FABRICATION, TRANSPORTATION , ERECTION & HOOK UP OF FLOW ARMS AT DDW1 OFFSHORE PLATFORM FOR KG-OSN-2001/3 BLOCK
	
| PROJECT NAME : | 
FABRICATION, TRANSPORTATION, ERECTION & HOOK UP OF FLOW ARMS AT DDW1 OFFSHORE PLATFORM FOR KG-OSN-2001/3 BLOCK | 
| YEAR : | 
2015 | 
| LOCATION : | 
 K .G BASIN ,DEEN DAYAL FIELD. EAST COAST OF INDIA | 
| OPERATOR : | 
 M/S. GSPC LTD. | 
| CLIENT : | 
M/S. GSPC LTD. | 
| VALUE (M. INR) : | 
66.8 | 
| PROJECT STATUS : | 
 COMPLETED | 
| DESCRIPTION : | 
FABRICATION ,INSTALLATION AND HOOK-UP OF 11 NOS DSS FLOWARMS(36 MM THK) ON DDW1 WELL PLATFORM. | 
 
 
 
 
	YETAGUN NORTH DEVELOPMENT PROJECT , MYANMAR
	
| PROJECT NAME : | 
YETAGUN NORTH DEVELOPMENT PROJECT , MYANMAR | 
| YEAR : | 
2014 | 
| LOCATION : | 
 MARTBAN GULF, MYANMAR | 
| OPERATOR : | 
PC MYANMAR (HONG KONG) LIMITED | 
| CLIENT : | 
M/S. LARSEN & TOUBRO LTD. | 
| VALUE (M. INR) : | 
185 | 
| PROJECT STATUS : | 
 COMPLETED | 
| DESCRIPTION : | 
HOOK -UP AND PRECOMMISSIONG OF WELL PLATFORM YET-D AND REATED MODIFICATION ON EXISTING PLATFORM YET-C AT MYANMAR | 
 
 
 
 
	E&I WORK FOR GTG & GDU (MODULE 2)AND PGC (MODULE 1) OF SAGAR PRAGATI
	
| PROJECT NAME : | 
E&I WORK FOR GTG & GDU (MODULE 2)AND PGC (MODULE 1) OF SAGAR PRAGATI | 
| YEAR : | 
2014 | 
| LOCATION : | 
 HAZIRA ,GUJRAT. INDIA | 
| OPERATOR : | 
M/S. ONGC LTD. | 
| CLIENT : | 
M/S. LARSEN & TOUBRO LTD. | 
| VALUE (M. INR) : | 
15.5 | 
| PROJECT STATUS : | 
 COMPLETED | 
| DESCRIPTION : | 
ELECTRICAL AND INSTRUMENTATION WORKS RELATED TO PGC 1& 2 | 
 
 
 
 
	B-127 & HRP –II PROJECT
	
| PROJECT NAME : | 
B-127 & HRP –II PROJECT | 
| YEAR : | 
2013 | 
| LOCATION : | 
MUMBAI HIGH HEERA & BASSEIN FIELD, INDIA | 
| OPERATOR : | 
M/S. ONGC LTD. | 
| CLIENT : | 
M/S. LARSEN & TOUBRO LTD. | 
| VALUE (M. INR) : | 
640 | 
| PROJECT STATUS : | 
 COMPLETED | 
| DESCRIPTION : | 
HOOK-UP AND PRE-COMMISSIONING OF 7 WELL PLATFORMS (B-127, B-157, B55-5, ZC, HK, HSD & HP) IN MUMBAI HIGH | 
 
 
 
 
	GSPC PLQP PROJECT OFFSHORE HOOK UP WORK FOR GSPC PLQP
	
| PROJECT NAME : | 
GSPC PLQP PROJECT OFFSHORE HOOK UP WORK FOR GSPC PLQP | 
| YEAR : | 
2013 – 2014 | 
| LOCATION : | 
K .G BASIN ,DEEN DAYAL FIELD. EAST COAST OF INDIA | 
| OPERATOR : | 
M/S. GSPC LTD. | 
| CLIENT : | 
M/S. LARSEN & TOUBRO LTD. | 
| VALUE (M. INR) : | 
130 | 
| PROJECT STATUS : | 
 COMPLETED | 
| DESCRIPTION : | 
 HOOK-UP, PRE-COMMISSIONING OF PROCESS CUM LIVING QUARTER PLATFORM – PLQP | 
 
 
 
 
	B-193 HOOK UP & COMMISSIONING WORK
	
| PROJECT NAME : | 
B-193 HOOK UP & COMMISSIONING WORK | 
| YEAR : | 
2013 – 2014 | 
| LOCATION : | 
 MUMBAI HIGH BASSEIN FIELD,INDIA | 
| OPERATOR : | 
M/S. ONGC LTD. | 
| CLIENT : | 
 M/S. SIME DARBY ENGINEERING SDN BHD. | 
| VALUE (M. INR) : | 
1630 | 
| PROJECT STATUS : | 
 COMPLETED | 
| DESCRIPTION : | 
HOOK-UP WORKS ON PROCESS PLATFORM B-193 AP & AQ PLATFORMS. PRE-COMMISSIONING AND COMMISSIONING OF 103 SUB-SYSTEMS WHICH INCLUDES AGRU ( ACID REMOVAL UNIT) & AGDU(ACID DISPOSAL UNIT). 
Piping-10,500 Inch. Dia. 
Structural-320 MT 
Cabling & Tubing-1, 55, 025 Mtrs | 
 
 
 
 
	MHN PP & LQ PROJECT 
	
| PROJECT NAME : | 
 MHN PP & LQ PROJECT | 
| YEAR : | 
2011 – 2012 | 
| LOCATION : | 
MUMBAI HIGH NORTH FIELD , INDIA | 
| OPERATOR : | 
M/S. ONGC LTD. | 
| CLIENT : | 
M/S. LARSEN & TOUBRO LTD | 
| VALUE (M. INR) : | 
180 | 
| PROJECT STATUS : | 
 COMPLETED | 
| DESCRIPTION : | 
HOOK-UP AND PRE-COMMISSIONING WORKS OF MNP PROCESS, MLQ LIVING QUARTER, HP FLARE & LP FLARE PLATFORMS. | 
 
 
 
 
	MHNRD - II TOPSIDE MODIFICATION, ONSHORE FABRICATION & OFFSHORE HOOK UP CONSTRUCTION.
	
| PROJECT NAME : | 
MHNRD – II TOPSIDE MODIFICATION, ONSHORE FABRICATION & OFFSHORE HOOK UP CONSTRUCTION. | 
| YEAR : | 
2010 – 2011 | 
| LOCATION : | 
 MUMBAI HIGH NORTH FIELD , INDIA | 
| OPERATOR : | 
M/S. ONGC LTD. | 
| CLIENT : | 
M/S. SWIBER OFFSHORE CONSTRUCTION LTD | 
| VALUE (M. INR) : | 
165 | 
| PROJECT STATUS : | 
 COMPLETED | 
| DESCRIPTION : | 
ONSHORE FABRICATION, TOPSIDE MODIFICATION AND HOOK-UP WTH EXISTING FACILITIES ON WELL PLATFORMS WI-4, NB, N1, NV & N6. 
ALSO FABRICATION OF RISER CLAMPS. | 
 
 
 
 
	N-18 COMPLETE DECK FABRICATION , PIPING, ARCHITECTURAL & E&I WORKS
	
| PROJECT NAME : | 
 N-18 COMPLETE DECK FABRICATION, PIPING, ARCHITECTURAL & E&I WORKS | 
| YEAR : | 
2010-2011 | 
| LOCATION : | 
 HAZIRA ,GUJRAT. INDIA | 
| OPERATOR : | 
M/S. ONGC LTD. | 
| CLIENT : | 
M/S. LARSEN & TOUBRO LTD | 
| VALUE (M. INR) : | 
41.5 | 
| PROJECT STATUS : | 
 COMPLETED | 
| DESCRIPTION : | 
INSTALLATION OF WALL PANELS, TILES, INSULATION, INSTALLATION OF EQUIPMENTS, DUCTING ETC | 
 
 
 
 
	ARCHITECTURAL & HVAC WORK FOR LQ MODULE OF MHN PROJECT
	
| PROJECT NAME : | 
ARCHITECTURAL & HVAC WORK FOR LQ MODULE OF MHN PROJECT | 
| YEAR : | 
2010-2011 | 
| LOCATION : | 
  HAZIRA, GUJRAT. INDIA | 
| OPERATOR : | 
M/S. ONGC LTD. | 
| CLIENT : | 
M/S. LARSEN & TOUBRO LTD | 
| VALUE (M. INR) : | 
32.5 | 
| PROJECT STATUS : | 
 COMPLETED | 
| DESCRIPTION : | 
INSTALLATION OF HVAC EQUIPMENTS, PIPING, INSULATION, DUCTING WORKS AND ARCHITECTURAL WORKS FOR LQ MODULE. | 
 
 
 
 
	ARCHITECTURAL & HVAC WORK FOR GTG MODULE OF MHN PROJECT
	
| PROJECT NAME : | 
 ARCHITECTURAL & HVAC WORK FOR GTG MODULE OF MHN PROJECT | 
| YEAR : | 
2010-2011 | 
| LOCATION : | 
HAZIRA, GUJRAT. INDIA | 
| OPERATOR : | 
M/S. ONGC LTD. | 
| CLIENT : | 
M/S. LARSEN & TOUBRO LTD | 
| VALUE (M. INR) : | 
67.5 | 
| PROJECT STATUS : | 
 COMPLETED | 
| DESCRIPTION : | 
INSTALLATION OF HVAC EQUIPMENTS, PIPING, INSULATION, DUCTING WORKS AND ARCHITECTURAL WORKS FOR GTG MODULE. | 
 
 
 
 
	HOOK-UP WORK FOR HA-HB & IA PLATFORM – MOQ PROJECT
	
| PROJECT NAME : | 
 HOOK-UP WORK FOR HA-HB & IA PLATFORM – MOQ PROJECT | 
| YEAR : | 
2009-2010 | 
| LOCATION : | 
AL SHAHEEN FIELD, DOHA OFFSHORE, QATAR. | 
| OPERATOR : | 
MAERSK OIL QATAR | 
| CLIENT : | 
M/S. LARSEN & TOUBRO LTD | 
| VALUE (M. INR) : | 
210 | 
| PROJECT STATUS : | 
 COMPLETED | 
| DESCRIPTION : | 
HOOK-UP AND PRECOMMISSIONING OF WELL PLATFORMS HA, HB & IA | 
 
 
 
 
	BCP-A2 PROJECT
	
| PROJECT NAME : | 
BCP-A2 PROJECT | 
| YEAR : | 
2008 | 
| LOCATION : | 
MUMBAI HIGH BASSEIN FIELD, INDIA | 
| OPERATOR : | 
M/S. ONGC LTD. | 
| CLIENT : | 
SAMSUNG HEAVY ENGINEERING , KOREA | 
| VALUE (M. INR) : | 
125 | 
| PROJECT STATUS : | 
 COMPLETED | 
| DESCRIPTION : | 
 HOOK-UP AND PRECOMMISSIONING OF PROCESS PLATFORM BCP-A2 INCLUDING ASSISTANCE DURING COMMISSIONING AT BASSEIN FIELD. | 
 
 
 
 
	BCP-B2 PROJECT
	
| PROJECT NAME : | 
BCP-B2 PROJECT | 
| YEAR : | 
2007 | 
| LOCATION : | 
MUMBAI HIGH BASSEIN FIELD, INDIA | 
| OPERATOR : | 
M/S. ONGC LTD. | 
| CLIENT : | 
 M/S. LARSEN & TOUBRO LTD. | 
| VALUE (M. INR) : | 
70 | 
| PROJECT STATUS : | 
 COMPLETED | 
| DESCRIPTION : | 
HOOK-UP AND PRE-COMMISSIONING OF PROCESS PLATFORM BCP-B2 INCLUDING ASSISTANCE DURING COMMISSIONING AT BASSEIN FIELD | 
 
 
 
 
	PIPELINE REPLACEMENT PROJECT (PRP) PHASE - I, II & III
	
| PROJECT NAME : | 
PIPELINE REPLACEMENT PROJECT (PRP) PHASE – I, II & III | 
| YEAR : | 
2006 -2007 | 
| LOCATION : | 
MUMBAI HIGH BASSEIN FIELD, INDIA | 
| OPERATOR : | 
M/S. ONGC LTD. | 
| CLIENT : | 
 M/S. LARSEN & TOUBRO LTD. | 
| VALUE (M. INR) : | 
175 | 
| PROJECT STATUS : | 
 COMPLETED | 
| DESCRIPTION : | 
DECK EXTENSIONS, INSTALLATION OF LAUNCHER/RECEIVERS AND ASSOCIATED PIPING , E&I AND HOOK UP WITH EXISTING FACILITIES ON 34 WELL PLATFORMS AT MUMBAI HIGH NORTH, SOUTH AND HEERA & NEELAM FIELD. | 
 
 
 
 
	BDP PROJECT - BASSEIN DEVELOPMENT PROJECT 
	
| PROJECT NAME : | 
BDP PROJECT – BASSEIN DEVELOPMENT PROJECT | 
| YEAR : | 
2016 | 
| LOCATION : | 
BASSEIN FIELD | 
| OPERATOR : | 
M/S. ONGC LTD. | 
| CLIENT : | 
M/S. LARSEN & TOUBRO LTD. | 
| VALUE (M. INR) : | 
180 | 
| PROJECT STATUS : | 
COMPLETED | 
| DESCRIPTION : | 
Hook up & Pre-commissioning of Process Platform BCP-A3, Living Quarter BLQ-3, Well Platform BH & related modification on BPA Complex (BPA, BCP-A, BCP –A2 & BLQ1). Replacement of Flare-Tip at MNF-1. | 
 
 
 
 
	LEWP-II (LIFE EXTENSION WELL PLATFORM PROJECT)
	
| PROJECT NAME : | 
LEWP-II (LIFE EXTENSION WELL PLATFORM PROJECT) | 
| YEAR : | 
2016 | 
| LOCATION : | 
MUMBAI HIGH NORTH & SOUTH FIELD | 
| OPERATOR : | 
M/S. ONGC LTD. | 
| CLIENT : | 
M/S. AFCONS | 
| VALUE (M. INR) : | 
98.5 | 
| PROJECT STATUS : | 
COMPLETED | 
| DESCRIPTION : | 
Onshore fabrication related to Topside Modification including Structural, Piping, Electrical, Architectural, Instrumentation, Fabrication of Handrails etc. of NU, NV & NT Platforms.
 OFFSHORE TOPSIDE MODIFICATION, HOOK UP, PRE-COMMISSIONING & ASSISTANCE FOR COMMISSIONING OF THE WELLHEAD PLATFORMS (NU, NV & NT).  | 
 
 
 
 
	LEWPP-I ( LIFE EXTENSION WELL PLATFORM PROJECT )
	
| PROJECT NAME : | 
LEWPP-I (LIFE EXTENSION WELL PLATFORM PROJECT) | 
| YEAR : | 
2016 | 
| LOCATION : | 
MUMBAI HIGH NORTH & SOUTH FIELD | 
| OPERATOR : | 
M/S. ONGC LTD. | 
| CLIENT : | 
M/S. AFCONS | 
| VALUE (M. INR) : | 
761.1 | 
| PROJECT STATUS : | 
COMPLETED | 
| DESCRIPTION : | 
REVAMPING OF 20 NOS WELL PLATFORM AT MUMBAI HIGH NORTH & SOUTH FIELD
 ONSHORE FABRICATION (PIPING, STRUCTURAL), REPLACEMENT OF DAMAGED STRUCTURE, PIPING, INSTRUMENTATION, EQUIPMENTS, REVAMP/NEW TEST SEPARATOR, REPLACEMENT OF EXISTING HELIDECK WITH NEW ALUMINIUM HELIDECK PANELS, PLATFORM PAINTING FROM -1 TO HELIDECK LEVEL. 
   | 
 
 
 
 
	MP POORV KSHETRA VIDYUT VITARAN CO.LTD (MPPKVVCL)
	
| PROJECT NAME : | 
MP POORV KSHETRA VIDYUT VITARAN CO.LTD (MPPKVVCL) | 
| YEAR : | 
2016 | 
| LOCATION : | 
NARSINGPUR, MP, INDIA | 
| OPERATOR : | 
 M/S. MPPKVVCL (M. P POORV KSHETRA VITARAN CO.LTD.) | 
| CLIENT : | 
M/S. MPPKVVCL (M. P POORV KSHETRA VITARAN CO.LTD.) | 
| VALUE (M. INR) : | 
508.2 | 
| PROJECT STATUS : | 
COMPLETED | 
| DESCRIPTION : | 
SUPPLY OF MATERIAL, SURVEY, INSTALLATION, TESTING & COMMISSIONING OF 11 KV FEEDERS UNDER FEEDER SEPARATION PROGRAMME FOR SEPARATION OF NON AGRICULTURAL AND AGRICULTURAL CONSUMERS IN RURAL AREA OF (O&M) DIVISION NARSINGPUR (LOT NO.15 R) OF NARSINGPUR DISTRICT OF MPPKVVCL JABALPUR (MP) AGAINST BALANCE PORTION OF ORIGINAL TERMINATED CONTRACT. | 
 
 
 
 
	FABRICATION OF TG BUILDING MODULE FOR BASSEIN DEVELOPMENT PROJECT)
	
| PROJECT NAME : | 
FABRICATION OF TG BUILDING MODULE FOR BASSEIN DEVELOPMENT PROJECT | 
| YEAR : | 
2016 | 
| LOCATION : | 
HAZIRA ,GUJRAT. INDIA | 
| OPERATOR : | 
M/S. ONGC LTD | 
| CLIENT : | 
M/S. LARSEN & TOUBRO LTD. | 
| VALUE (M. INR) : | 
51.3 | 
| PROJECT STATUS : | 
COMPLETED | 
| DESCRIPTION : | 
FABRICATION AND ERECTION OF STRUCTURAL MEMBERS, LEGPOTS, GRATINGS, FABRICATION OF PLATE GIRDER, ERECTION AND ALIGNMENT OF STATIC & ROTARY EQUIPMENTS, ASSEMBLY AND ERECTION OF COOLER STRUCTURE, ASSEMBLY AND ERECTION OF DUCTS, FABRICATION AND ERECTION OF PIPING & ASSOCIATED VALVES, FITTING, TESTING ETC | 
 
 
 
 
	TG BUILDING MODULE - BASSEIN DEVELOPMENT PROJECT
	
| PROJECT NAME : | 
TG BUILDING MODULE – BASSEIN DEVELOPMENT PROJECT | 
| YEAR : | 
2016 | 
| LOCATION : | 
HAZIRA ,GUJRAT. INDIA | 
| OPERATOR : | 
M/S. ONGC LTD. | 
| CLIENT : | 
M/S. LARSEN & TOUBRO LTD. | 
| VALUE (M. INR) : | 
59.4 | 
| PROJECT STATUS : | 
COMPLETED | 
| DESCRIPTION : | 
E&I, ARCHITECTURAL, HVAC & PIPING WORK AT TGBM PLATFORM & ARCHITECTURAL WORK OF BH WELL HEAD DECK OF BDP PROJECT. | 
 
 
 
 
	OFFSHORE HOOK-UP FOR PROCESS CUM LIVING QUARTER PLATFORM (PLQP) PROJECT (Amendment No.04)
	
| PROJECT NAME : | 
OFFSHORE HOOK-UP FOR PROCESS CUM LIVING QUARTER PLATFORM (PLQP) PROJECT (AMENDMENT NO.04) | 
| YEAR : | 
2016 | 
| LOCATION : | 
K .G BASIN ,DEEN DAYAL FIELD. EAST COAST OF INDIA | 
| OPERATOR : | 
M/S. GSPC LTD. | 
| CLIENT : | 
M/S. LARSEN & TOUBRO LTD. | 
| VALUE (M. INR) : | 
339.3 | 
| PROJECT STATUS : | 
COMPLETED | 
| DESCRIPTION : | 
REPLACEMENT OF EXISTING POTABLE WATER PIPING WHICH INCLUDES FABRICATION, INSTALLATION AND TESTING | 
 
 
 
 
	GSPC FLOWARMS AT DDW1 OFFSHORE PLATFORM 
	
| PROJECT NAME : | 
GSPC FLOWARMS AT DDW1 OFFSHORE PLATFORM | 
| YEAR : | 
2015 | 
| LOCATION : | 
KG FIELD | 
| OPERATOR : | 
M/S. GSPC LTD. | 
| CLIENT : | 
M/S. GSPC LTD. | 
| VALUE (M. INR) : | 
66.8 | 
| PROJECT STATUS : | 
COMPLETED | 
| DESCRIPTION : | 
Fabrication, Transportation, Erection & Hook up of Flowarms at DDW-1 Offshore Platform for KG-OSN-2001/3 Block | 
 
 
 
 
	SBPDCL PROJECT
	
| PROJECT NAME : | 
SBPDCL PROJECT | 
| YEAR : | 
2014 | 
| LOCATION : | 
PATNA, BIHAR, INDIA | 
| OPERATOR : | 
JOINT VENTURE WITH PRAVIN ELECTRICALS | 
| CLIENT : | 
M/S. SOUTH BIHAR POWER DISTRIBUTION COMPANY LIMITED. | 
| VALUE (M. INR) : | 
2050 | 
| PROJECT STATUS : | 
COMPLETED | 
| DESCRIPTION : | 
DESIGN, SUPPLY OF EQUIPMENT AND MATERIAL, TRANSPORTATON & STORAGE, INSTALLATION/ERECTION INCLUDING ASSOCIATED CIVIL WORKS, TESTING COMMISSIONING INCLUDING PERFORMANCE TESTING OF ALL THE EQUIPMENTS SUPPLIED FOR STRENGTHENING, IMPROVEMENT AND AUGMENTATION OF DISTRIBUTION SYSTEM CAPACITY UNDER R-APDRP (PART B) SCHEME IN 9 TOWNS OF CENTRAL ELECTRIC SUPPLY AREA & 11 TOWNS OF MAGADH ELECTRIC SUPPLY AREA, PATNA AREA OF BIHAR ON TURNKEY BASIS |